Michigan Bids > Bid Detail

2023-2024 Ransom Street Improvements

Agency: Kalamazoo
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD11717445169966106
Posted Date: Jan 6, 2023
Due Date: Feb 14, 2023
Solicitation No: Reference number: 91300-009.0
Source: https://www.kalamazoocity.org/...
2023-2024 Ransom Street Improvements

Closing date February 14, 2023, 03:00 PM

  • Reference number 91300-009.0
  • Status Open
  • Summary The remaining original Ransom Street Sanitary Sewer Interceptor, Walbridge to Westnedge, is under capacity for the existing tributary area. This Project will replace the remaining entirety of the original interceptor with one which meets current engineering and regulatory standards. The Project will also identify and replace lead water services which may exist within the construction limits.

91300-009.0 Bid Document (PDF, 85MB)

91300-009.0 Plans (PDF, 40MB)

91300-009.0 Distribution List (PDF, 41KB)

MANDATORY PRE-BID MEETING

Tuesday, January 24, 2023 at 10:00 a.m.

Kalamazoo Water Reclamation Plant -1415 Harrison Street, Kalamazoo, MI 49007

Conference Room A

The remaining original Ransom Street Sanitary Sewer Interceptor, Walbridge to Westnedge, is under capacity for the existing tributary area. This Project will replace the remaining entirety of the original interceptor with one which meets current engineering and regulatory standards. The existing watermain on Ransom Street is a transmission main upgrade candidate to increase the long-term reliability of the water utility. The Project will also identify and replace lead water services which may exist within the construction limits. The right-of-way corridor will also receive planned improvements. The existing Ransom Street corridor is a mix of City Local and City Major streets including sections of brick pavement. The planned intent of this Project is to extend the City Major Street designation from Burdick Street to Westnedge Avenue with alignment with Imagine Kalamazoo 2025 and the Northside Neighborhood Plan, 2018. The corridor design will also include consideration for the Northside Cultural Business District, historical brick street sections, as well as traffic flows of related anticipated corridor improvements.

A portion of the original interceptor, watermain, and right-of-way Corridor was upgraded and improved from Gull Street to Walbridge under the River’s Edge Roundabout Project. This Project continues both the utility infrastructure and right-of-way corridor upgrades and improvements.

The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo.

The Contractor shall have all work included in Phase 1A, 1B, and 1C complete no later than November 1, 2023 in compliance with the City of Kalamazoo seasonal moratorium.

The Contractor shall have all work completed by November 1, 2024.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >