Station 25 Booster Pump 2 Rebuild

Closing date March 14, 2023, 03:00 PM

  • Reference number 93691-001.0
  • Status Open
  • Summary This specification describes the general requirements for repairs and refurbishing one (1) Goulds 8” Discharge Split Case High Service Pump. The pump model is a Goulds 3405, Serial No. 249B665-1-2 rated for 2250 GPM at 210 Feet TDH at 1770 RPM. The pump is located at the City of Kalamazoo Station No.25 located on Campbell Lake in Comstock Township (near H Avenue and North 28th Street).

93691-001.0 Bid Document (PDF, 5MB)

93691-001.0 Distribution List (PDF, 22KB)

PRE-BID MEETING

Tuesday, February 21, 2023 at 10:00 a.m.

Kalamazoo Water Reclamation Plant -1415 Harrison Street, Kalamazoo, MI 49007

Conference Room A

This specification describes the general requirements for repairs and refurbishing one (1) Goulds 8” Discharge Split Case High Service Pump. The pump model is a Goulds 3405, Serial No. 249B665-1-2 rated for 2250 GPM at 210 Feet TDH at 1770 RPM. The pump is located at the City of Kalamazoo Station No.25 located on Campbell Lake in Comstock Township (near H Avenue and North 28 th Street). Contractor to include all materials, labor, and any other fees into the lump sum bid.

The City of Kalamazoo will provide use of the overhead crane at Station No.25 and will provide access for Contractor load out at Station No. 25. Contractor is responsible for prepping, rigging components, rigging and loading of the pump. Contractor is responsible to take pump and pump components loaded and rigged by the Contractor to place on Contractor transport vehicle.

Contractor will be responsible for uncoupling of the motor from the pump. Disconnecting all bolts required for removal of the pump from the pump skid. Rigging of the pump to be removed, and removing the pump from Station No. 25. All tools and rigging required to remove pump, as well as unrigging pump when placed on the Contractor transport vehicle is the Contractor’s responsibility. All safety equipment and procedures to complete the above tasks are the Contractor’s responsibility.