Michigan Bids > Bid Detail

Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase 1

Agency: DEPT OF DEFENSE
Level of Government: Federal
Category:
  • F - Natural Resources and Conservation Services
Opps ID: NBD00159145038458542
Posted Date: Oct 12, 2022
Due Date: Nov 14, 2022
Solicitation No: W911XK22B0003
Source: https://sam.gov/opp/f40dc850f2...
Follow
Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase 1
Active
Contract Opportunity
Notice ID
W911XK22B0003
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
LRD
Office
W072 ENDIST DETROIT
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Oct 12, 2022 10:02 am EDT
  • Original Published Date: Oct 12, 2022 09:49 am EDT
  • Updated Date Offers Due: Nov 14, 2022 02:00 pm EST
  • Original Date Offers Due: Nov 14, 2022 02:00 pm EST
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 05, 2022
  • Original Inactive Date: Dec 05, 2022
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: F108 - ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
    Muskegon , MI 49445
    USA
Description
Environmental Remediation Services Construction project to implement system upgrade recommendations for the Ott Story Superfund Site Operable Unit #2 Groundwater Remedy in Muskegon (Dalton Township), Michigan. The design is intended to improve the effectiveness of the collection system to maintain contaminated groundwater plume capture and contaminant mass removal for the OU1/OU2 remedy. The work includes the following major items: a. Install new extraction wells, associated appurtenances, and connect to existing system. New wells are numbered to coordinate with existing wells: EW-2a, EW-3a, EW 4a, EW-5a, EW-6b.b.        Installation of three new rehabilitation wells at each new EW location (total of 15 wells) to allow for chemical rehabilitation of the well and aquifer immediately surrounding the well. c.        Installation of below grade electrical conduit within concrete ductbank from each new EW location back to the control panel. d. Installation of above-ground weatherproof enclosures for each new extraction well piping and flow measurement equipment. e. Upgrade and replace existing manifold piping and appurtenances in below grade EW vaults (EW-1, EW-2, EW-3, EW-4, EW-5, EW-7, EW-8 and EW-9) with PVC materials (3-inch diameter). f. Replace all system flow meters with consistent make/model. g. Install pressure gauges on collection lines E and F in Valve Vaults 1, 2 and 3. There are no existing gauges in the vaults. No comm or power wiring for gauges is required. h. Install new standby back-up power generation and control for the new well extraction well network. i. Upgrade controls infrastructure to allow remote monitoring of the expanded well extraction well network. j. Complete monitoring well abandonment actions to optimize the existing well network. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911XK22B0003' to obtain more details.*
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • CONTRACTING OFFICE KO 477 MICHIGAN AVE RM 617
  • DETROIT , MI 48226-5000
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >